Camp Howard Dining Hall

Spectacular views of Mount Hood and Bull Run Reservoir are promised at the new 7,580-square-foot lodge and dining hall planned…

Spectacular views of Mount Hood and Bull Run Reservoir are promised at the new 7,580-square-foot lodge and dining hall planned for Camp Howard, where the Catholic Youth Organization provides weeklong summer camps.

The new building will offer a kitchen, indoor and outdoor dining, expanded food storage, restrooms, staff break room and enhanced meeting space at the 245-acre camp. It’s expected to accommodate 540 campers – more than twice as many as can be served in the existing hall.

Grace Baptist Church

A modern, new look is on the horizon for Grace Baptist Church. The addition of an aluminum storefront, new Fellowship…

A modern, new look is on the horizon for Grace Baptist Church. The addition of an aluminum storefront, new Fellowship Hall and expanded foyer at the entrance will give the 26,500-square-foot building a new appearance.

The installation of an elevator and new main staircase will provide better access to the building’s second floor. The 4,000-square-foot addition has tilt-up concrete walls and a steel roof structure with standing seam roofing. The church’s HVAC, plumbing and electrical systems are being replaced, and a new fire sprinkler system will be installed to protect the entire building.

With an eye on future expansion, the church is also getting new classroom space, parking lot and site infrastructure.

Bickmore Hall

This project consists of selective demolition and complete remodel of an existing 12,150-square-foot residential housing facility on the campus of…

This project consists of selective demolition and complete remodel of an existing 12,150-square-foot residential housing facility on the campus of St. Mary’s Home for Boys.

SouthLake Foursquare

This "design-build" project consisted of new construction of a 10,250 square foot Worship/Education building and site development of approximately 6.25…

This “design-build” project consisted of new construction of a 10,250 square foot Worship/Education building and site development of approximately 6.25 acres. Building construction is wood and Timberstrand frame, composition roof and features designer vinyl siding. The building is fully sprinklered from a stand-alone system (storage tank and fire pump) and is designed to fully accommodate a “mirrored” phase two addition with minimal infrastructure changes.

Lake Bible Church

Constructed on 9.2 acres, the site work included wetland mitigation areas and a half street improvement. This first of three…

Constructed on 9.2 acres, the site work included wetland mitigation areas and a half street improvement. This first of three phases involved the construction of a large multipurpose room with a gymnasium type wood floor and glass backboards. The room has a large stage and is capable of seating approximately 700 people. Two classroom wings border either side of the multipurpose room. Natural lighting comes from large skylights. These three major areas are tied together by the narthex.

Good Shepherd Community Church

The Worship Center addition includes a 1,500 seat Sanctuary. The structural steel frame is approximately 41,000 square feet in size…

The Worship Center addition includes a 1,500 seat Sanctuary. The structural steel frame is approximately 41,000 square feet in size and includes wood siding, cement plaster and cultured stone as finishes at the exterior. The flat Sanctuary floor allows for larger banquets (fed from the new commercial kitchen) and sports activities maintaining a true multi-purpose facility. Permanent seating in the balcony areas reduce setup time for each event and improve lines of sight to larger assemblies.

Christ Episcopal Church

Construction of the two story Parish Hall involved approximately 13,750 square feet of new construction and extensive remodeling of existing…

Construction of the two story Parish Hall involved approximately 13,750 square feet of new construction and extensive remodeling of existing areas to include an elevator, new kitchen, bathrooms, narthex, and commons facilities. The skeleton is composed of tube steel framing, light wood framing, and a roof of laminated wood decking. Additional work included repaving the existing and putting in a new parking lot. The church remained fully operational during construction.

Good Shepherd Community Church Education Wing

This project involved the demolition of an 8,000 square foot classroom wing and construction of the new Education Building, a…

This project involved the demolition of an 8,000 square foot classroom wing and construction of the new Education Building, a 40,231 sf addition consisting of two stories with a full basement. The building contains 19 classrooms, two large meeting rooms, an entrance, foyer, café, storage rooms, nursery, nursing room, media room, restrooms, and large exterior courtyard. The site work included new sidewalks, concrete curbs, asphalt paving, landscaping, pavement marking and signage.